Leveling the tide staff to assure it hasn’t moved vertically since installation. Teacher at Sea Rosalind Echols holding the level rod for the benchmark leveling process. In her words “It is incredibly difficult to hold 12 feet of leveling rod level.”
Photo Date: 2013
| 480 x 640 | 77.16 KB | |
| 960 x 1280 | 281.89 KB | |
| 1440 x 1920 | 561.21 KB | |
| 1934 x 2579 | 1.14 MB |
| Added On | 16th October 2015 |
| Viewed | 7 viewed |
| Downloads | 1 Downloaded |