The restoration site - post restoration. Here the site is seen on an outgoing tide. The restoration increased the tidal range of the upstream side of the creek so that it was roughly equivalent to the downstream side. The culvert measured approximately 5’ x 8’ and was designed to provide appropriate hydrologic conditions to increase productive fish habitat.
Photo Location: Massachusetts, Ipswich, Essex County
Photo Date: November 1998
| 640 x 421 | 54.71 KB | |
| 1280 x 841 | 183.17 KB | |
| 1772 x 1164 | 404.45 KB |
| Added On | 19th October 2015 |
| Viewed | 11 viewed |