Installing tide gage at low tide. Algae and barnacle encrusted boulders make traversing this area a challenge. Drill is used to install tidal benchmarks.
| 640 x 480 | 66.04 KB | |
| 1280 x 960 | 241.26 KB | |
| 1920 x 1440 | 494.68 KB | |
| 2592 x 1944 | 1.07 MB |
| Added On | 16th October 2015 |
| Viewed | 5 viewed |