George Leigh atop pole’s ladder installing survey equipment and hooking up electrical connections. Also connecting additional guy wires that will be tightened after the pole is telescoped.
426 x 640 | 49.93 KB | |
851 x 1280 | 163.71 KB | |
1297 x 1951 | 370.58 KB |
Added On | 17th October 2015 |
Viewed | 9 viewed |
Downloads | 1 Downloaded |